|
Acclimatization |
|
|
Before installing the Krono laminate flooring ensure that the unopen packs have been acclimatized in the room where you plan to use them for a period of at least 48 hours. The temperature in the room should be between 15°C and 30°C and a humidity level between 50- 70%.
|
|
|
|
|
|
Necessary tools and accessories |
|
|
- damp proof membrane
- underlay
- pencil
- saw
- laminate installation kit (expansion blocks, hammer)
|
|
|
Preparing the floor |
|
|
Clean the base floor and make sure that any irregularities in the surface exceeding 1 mm have been smoothed out, that any soft flooring such as carpets has already been removed and that the planks have been installed crosswise from an existing wood base floor.
|
|
|
|
|
|
|