|
General |
|
|
The PRO click installation system offers an easy handling, as the floor boards can be securely connected through a click, making the installation a quicker and cleaner process. The floors can be used immediately after the setup.
|
|
|
Tools needed for the installation of the floor |
|
|
To obtain the best results, follow the steps as indicated. Use the following tools and accessories to install your new laminate flooring:
- hammer
- saw
- pencil
- measure
- installation kit (spacers and tapping block)
- underlay system
- maintenance products
|
|
|
Preparation |
|
|
Prior to laying the laminate floor, leave the flooring boards in packs, laid flat, in the center of the room where you want to install the laminate floor over a period of a least 48 hours.
The temperature in the room must not be less than 18 degrees C while the humidity level must stay within 40% to 70%. Post acclimatisation inspect every floor board and remove the deficient ones.
|
|
|
Sub floor |
|
|
Prior to laying the laminate flooring remove all textile floor coverings.
The floor surface must measure at least 15 degrees C and any irregularities exceeding 3 mm over a 100 cm interval must be smoothed out.
Clean the surface of the base floor thoroughly before installation.
|
|
|
|